Sign Up!
Login
Welcome to Trumbowers
Monday, September 06 2010 @ 07:43 PM EDT

The Leakage

Paris Prose


It was early in the morning on February 10th, and Mr. Shea was hard at work, not doing homework but doing work that involves a lot of recycle bins and garbage cans.

There were ceiling tiles and water all over the floor. He had about seven buckets on the floor because a bunch of water was dripping from the ceiling.  We didn’t know how much water was behind our cupboards, but Mr. Shea thought there were gallons. Behind our cupboards there was a leak that poured out like a water faucet.

There were two buckets behind the computer.  I’m afraid that the water was going to land on the computer and break it.

If the water gets so leaky we might have to go home.  I hope we don’t have to go home.  It might get better tomorrow.

Mr. Shea put a man in the ceiling.  Actually it was a pair of pants with newspaper stuffed so it looked like a man.

The next day it was all better.  A lot of people asked why we had a man in the ceiling.  We said it was just for fun.

Trackback

Trackback URL for this entry: http://trumbower.net/trackback.php?id=20090518133539670

No trackback comments for this entry.

1 comments

The following comments are owned by whomever posted them. This site is not responsible for what they say.
Authored by: Anonymous on Monday, May 18 2009 @ 06:10 PM EDT The Leakage

Cute....something you will never forget. gram

Topics

My Account





Sign up as a New User
Lost your password?

Events

There are no upcoming events